Inferno Solar engaged directly with all stakeholders to carefully coordinate the solar array with structural, mechanical, and refrigeration trades. Inferno hired a gasfitter to rerun...
Archives: Project
JVIC
Provide a clean energy solution on a very congested roof on a new industrial building with limited structural capacity due to mechanical equipment. The design of...
Freudenberg
We helped to meet the Corporate Social Responsibility mandate cost-effectively. The building structure has a limited capacity for solar, and the rooftop has numerous pieces...
NACG
This solution financially benefited both the tenant and the building landlord. The building’s structural capacity for the solar system and the highly compressive insulation on...
Silent Aire P9
This project was initially supposed to be installed as a high profile south-facing ground mount but had insufficient room on-site due to congested utilities on...
Telus Edmonton
The existing pre-engineered steel building was being re-purposed while keeping costs down. The building had the insufficient structural capacity for solar panels and the roof...
EV Readiness Project
This project has similar requirements to a new subdivision. The site will feature 1,000 Level 3 chargers, and the construction required over 80,000ft of conduit,...
Telus Park Calgary
Our alternate-coloured panels cleverly spell out TELUS. As a building situated directly under the flight path to the Calgary International Airport, this was an effective...